Bruce Suprenant, Technical Director, The Voice Newsletter October 2016 ACI 301-16 “Specifications for Structural Concrete” adopted a new provision for initial curing of flatwork. This provision will increase the cost of performing work for concrete that does not bleed enough to show a visible water sheen. The new provision is shown below: 5.3.6.2 Initial curing of unformed concre...

Read More

Ward Malisch, Concrete Construction Specialist, The Voice Newsletter, September 2016 Have you seen or heard of any requirements for formed concrete surface quality in bid packages? They might be in the form of a reference to ACI 347.3R-13, “Guide to Formed Concrete Surfaces,” in specifications based on models such as AIA MasterSpec™. Sometimes specifications other than AC...

Read More

Bruce Suprenant, Technical Director, The Voice Newsletter July 2016 Shrinkage and temperature reinforcement requirements for design of reinforced concrete structures have been included in the ACI building code since 1928, and haven’t changed much in nearly 85 years. The ACI 318-14 Commentary states that the amounts of shrinkage and temperature reinforcement specified for deformed bars and...

Read More

Bruce Suprenant, Technical Director, The Voice Newsletter June 2016 Shrinkage and temperature reinforcement requirements for design of reinforced concrete structures have been included in the Know the Design Requirements Operable partitions are those that can be quickly put in place or removed and stored to provide flexibility in the spaces typically used for meetings or social functions. Th...

Read More

Bruce Suprenant, Technical Director, The Voice Newsletter May 2016 When is 24.88 equal to 25? The project specification required a specified overall value (SOV) for floor flatness of 25. F-numbers were measured within 72 hours in accordance with ASTM E 1155-14 “Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers.” Unlike most ASTM standard test ...

Read More

Bruce Suprenant, Technical Director, The Voice Newsletter, April 2016 We have been asked recently about how to join an ACI technical committee. This is a nice step forward from when we used to be asked: Why join an ACI committee?” Now that we passed the “why” hurdle, let’s tackle the “how” of ACI committee membership. The information presented is excerpted fr...

Read More

Bruce Suprenant, Technical Director, The Voice Newsletter, February 2016 Most contractors are aware of the criteria established by ACI 117-15 “Specifications for Tolerances for Concrete Materials and Construction” for measuring floor surfaces “within 72 hours after completion of slab concrete finishing operations and before removal of any supporting shores.” The criter...

Read More

Categories
Archives
ASCC Logo white letters on red cubes

The only association by and for all concrete contractors

Join Now

Contact Info

American Society of Concrete Contractors
2025 S. Brentwood Blvd.
Suite 105
St. Louis, MO 63144
314-962-0210
ASCC Staff Login

Connect with ASCC

ASCC:

DCC:

CPC: