2019 DCC Award Winner
Miller Park Amphitheather, T.B. Penick & Sons, Inc.
First Place: Cast-in-place – Special Finishes / Under 5000 SF
First Place: Multiple Applications / Under 5000 SF

Penick collaborated on the design and installation of the splash pad with Aquatic Design Group and their inhouse mosaic artist. The integrally-colored, quarried-stone finish concrete work and monolithically-embedded mosaic tile design reflect the pattern found on San Bernardino’s largest library, adjacent to the site. Inspiration for the design came from the library’s hand-painted Mexican tiles, incorporating gold, yellow, blue, and iridescent tiles which provide a unique reflectivity that shimmers and sparkles. The 2,464 SF of mosaics took two months to create, including the time to procure materials.